We can capture the number of days the opportunity stayed in a stage using custom field+wf+field update. This works on the current records and on the existing records if they are edited(the value will not be equal to Standard Stage Duration field available on the Report).
Is there a way to capture the Opportunity Stage Duration Days on the existing records,making the resultant value equals to the Standard Stage Duration.