0

I have a record triggered Flow that I would like to schedule a future field update with, and also have an immediate update run to toggle a switch back to an 'off' position.

When I have an Update Records node in the 'Run Immediately' path, the other scheduled path (which is set to run 5 minutes after the initial record update) does not run. If I have nothing in the 'Run Immediately' path, then the scheduled path works as normal.

Basically my question is: can a record triggered flow run the 'Run Immediately' path and another scheduled path in the same transaction? I have not been able to find anything that addresses this question, and currently it looks like either it isn't supported, is bugged, or my error.

1 Answer 1

1

Ah I figured it out. My 'Run Immediately' field update was changing a field that was initially in the entry criteria for the flow. As soon as the entry criteria was not met, the scheduled path was removed.

You must log in to answer this question.

Not the answer you're looking for? Browse other questions tagged .